Area
|
Summary of Commission
|
Museum | Issues surrounding the suitability of a fire alarm system |
Government |
Dispute related to the performance of a facilities provider |
Airport |
Dispute following a personal injury |
Port Terminal |
Issues related to the undersizing of heating/cooling systems |
Place of Worship |
Various design/installation issues |
Library Building |
Dispute regarding design/installation of a rainwater system |
Hospital |
Dispute regarding design/installation of a hot water system |
Hospital |
Investigation into the corrossion of heating pipework |
Hospital |
Investigation into the corrosion of both chilled water and heating pipework |
Restaurant |
Dispute related to the suitablity of an air conditioning system |
Office |
Review of design following expression of concerns from client |
Office |
Dispute between landlord and tenant due to project delays |
Office
Office
|
Dispute following catastrophic water leak
Dispute connected with an Extension of Time and additional works claim. |
Office | Various Design and Installation Issues |
Office | Issues with low chilled water and heating water flow rates |
Sports Centre |
Issues concerning the mechanical services |
|
|
|